Seguici su

SUPERLOCAL by Dusseldorp

The ambition of the circular area development SUPERLOCAL is to reuse the materials of two vacant high-rise for the construction of approximately 130 new homes and the layout of the public area. A cooperation between multiple stakeholders made it possible to extract a complete concrete construction out of a building that would otherwise be demolished. The construction has been settled in the surrounding area and is applied for new housingspaces. The creation of this concept led to a longer lifespan of existing materials and a reduction in raw material use.

Product value chain
Concrete construction is build
Concrete construction is in use
Concrete construction will be disassembled
Concrete construction is transported to new area
Concrete construction is secured to its new terrain
Business Readiness Level
Technology Readiness Level
Commercial Readiness Level
Business Readiness Level

BRL are are way to cenchmark the current status of a venture - from concept to mature business.

  • 9
    Business model is final and scaling with growing recurring revenues that results in a profitable and sustainable business
  • 8
    Sales and metrics show business model holds and can scale
  • 7
    Product/market fit and customer payment willingness shown
  • 6
    Full business model including pricing verified on customers
  • 5
    First version of revenue model including pricing hypotheses
  • 4
    First projection show economic viability and market potential
  • 3
    Draft of business model in canvas
  • 2
    First possible business concept described
  • 1
    Hypothesis in business concept
Technology Readiness Level

TRL are type of a measurement system used to access the matirity level of particular technology.

  • 9
    System proven through successful operation
  • 8
    System proven trough successful test and demonstration
  • 7
    Prototype demonstration in operational environment
  • 6
    Prototype demonstration in relevant environment
  • 5
    Component validation in relevant environment
  • 4
    Component validation in laboratory environment
  • 3
    Proof of concept
  • 2
    Technology concept/application formulated
  • 1
    Basic principles observed and reported
Business Readiness Level

CRL define the spectrum of commercial maturity, from basic market research to full deployment.

  • 9
    Market introduction to the expressed need on the market
  • 8
    Identification of the product or service possessing the competencies
  • 7
    Definition of the necessary and sufficient competencies
  • 6
    Translation of the expected functionalities into needed capabilities
  • 5
    Identification of the systemic capabilities
  • 4
    Quantifiaction of the expected functionalities
  • 3
    Identification of expected functionalities
  • 2
    Identification of specific need
  • 1
    Basis Hypothesis: Something is missing