Folgen Sie uns

Hempstatic — Hempcrete biocomposite acoustic panels by ZAG

About ZAG

Hempstatic produces Hempstatic® Sound Absorbers, hempcrete biocomposite panels for interior acoustic and insulation applications. The composite combines hemp shives (agricultural by-product) with a lime-based binder, with no toxic additives or synthetic compounds, and is designed for a non-hazardous end-of-life scenario. Independent testing confirms fire classification B-s1, d0 (EN 13501-1), very low TVOC and formaldehyde emissions well below EN 16516 and WHO indoor air quality guidelines, vapour permeability supporting moisture regulation, and approximately 94% lower global warming potential compared with a polyurethane insulation benchmark. Panels were installed and pilot-tested at NIGRAD Dogoše near Maribor (Slovenia) over 14 m² across two rooms, reducing reverberation time by 0.5 seconds at 500 Hz in both cases. CRL 3, TRL 4, BRL 3: technical performance is well-validated, certification is expected for 2027, and the commercial expansion path is in early stage.

Source: ReBuilt deliverable D.2.4.1, Report on circular value chain and business models, version 2.0, 31 May 2026.
Source: ReBuilt deliverable D.2.2.1, Report on tested bio-concrete solutions, version 4.0, 30 September 2025.
Published through the ReBuilt project (Interreg Central Europe, CE0100390). See the ReBuilt project entry.

ReBuilt project entry

D.2.1.1, Innovative circular and digital solutions for construction sector in CE

D.2.2.1, Report on tested bio-concrete solutions

Product value chain
Production and finishing
Hempcrete panels produced as ready-to-install acoustic and insulation elements
Business Readiness Level
Technology Readiness Level
Commercial Readiness Level
Business Readiness Level

BRL are are way to cenchmark the current status of a venture - from concept to mature business.

  • 9
    Business model is final and scaling with growing recurring revenues that results in a profitable and sustainable business
  • 8
    Sales and metrics show business model holds and can scale
  • 7
    Product/market fit and customer payment willingness shown
  • 6
    Full business model including pricing verified on customers
  • 5
    First version of revenue model including pricing hypotheses
  • 4
    First projection show economic viability and market potential
  • 3
    Draft of business model in canvas
  • 2
    First possible business concept described
  • 1
    Hypothesis in business concept
Technology Readiness Level

TRL are type of a measurement system used to access the matirity level of particular technology.

  • 9
    System proven through successful operation
  • 8
    System proven trough successful test and demonstration
  • 7
    Prototype demonstration in operational environment
  • 6
    Prototype demonstration in relevant environment
  • 5
    Component validation in relevant environment
  • 4
    Component validation in laboratory environment
  • 3
    Proof of concept
  • 2
    Technology concept/application formulated
  • 1
    Basic principles observed and reported
Business Readiness Level

CRL define the spectrum of commercial maturity, from basic market research to full deployment.

  • 9
    Market introduction to the expressed need on the market
  • 8
    Identification of the product or service possessing the competencies
  • 7
    Definition of the necessary and sufficient competencies
  • 6
    Translation of the expected functionalities into needed capabilities
  • 5
    Identification of the systemic capabilities
  • 4
    Quantifiaction of the expected functionalities
  • 3
    Identification of expected functionalities
  • 2
    Identification of specific need
  • 1
    Basis Hypothesis: Something is missing

Products