CoGreen — Hempcrete noise barriers for highway and railway infrastructure by CoGreen d.o.o.

About CoGreen d.o.o.

CoGreen develops the NoHiRiNoise solution: a hempcrete-based noise barrier for highway and railway infrastructure, made from hemp shives, lime-based binder, and water. The composite has a density of approximately 300 kg/m³ and delivers noise reduction of 45-50 dB, with substantially lower embodied energy and longer service life than conventional noise barriers made of concrete, steel, aluminium, or wood. The hempcrete formulation contributes carbon sequestration through the hemp biomass, with quantification subject to ongoing life-cycle assessment work. CoGreen is at CRL 5, TRL 4, BRL 6: market interest is established (BRL high), the certification process is in progress with expected completion end 2026, and technical maturity is mid-stage.

Product value chain
Production and installation
Hempcrete noise-barrier panels produced and installed at highway and railway sites
Business Readiness Level
Technology Readiness Level
Commercial Readiness Level
Business Readiness Level

BRL are are way to cenchmark the current status of a venture - from concept to mature business.

  • 9
    Business model is final and scaling with growing recurring revenues that results in a profitable and sustainable business
  • 8
    Sales and metrics show business model holds and can scale
  • 7
    Product/market fit and customer payment willingness shown
  • 6
    Full business model including pricing verified on customers
  • 5
    First version of revenue model including pricing hypotheses
  • 4
    First projection show economic viability and market potential
  • 3
    Draft of business model in canvas
  • 2
    First possible business concept described
  • 1
    Hypothesis in business concept
Technology Readiness Level

TRL are type of a measurement system used to access the matirity level of particular technology.

  • 9
    System proven through successful operation
  • 8
    System proven trough successful test and demonstration
  • 7
    Prototype demonstration in operational environment
  • 6
    Prototype demonstration in relevant environment
  • 5
    Component validation in relevant environment
  • 4
    Component validation in laboratory environment
  • 3
    Proof of concept
  • 2
    Technology concept/application formulated
  • 1
    Basic principles observed and reported
Business Readiness Level

CRL define the spectrum of commercial maturity, from basic market research to full deployment.

  • 9
    Market introduction to the expressed need on the market
  • 8
    Identification of the product or service possessing the competencies
  • 7
    Definition of the necessary and sufficient competencies
  • 6
    Translation of the expected functionalities into needed capabilities
  • 5
    Identification of the systemic capabilities
  • 4
    Quantifiaction of the expected functionalities
  • 3
    Identification of expected functionalities
  • 2
    Identification of specific need
  • 1
    Basis Hypothesis: Something is missing

Products

Market

Comparable CEBM's